Welcome to the next chapter of construction.
The rent is determined according to the equipment and its type of work.
How much oil will be consumed per hour is calculated according to the type of equipment, type of work, type of engine model.
Equipment is usually rented for a minimum period of three months. But can be relaxed in special cases and considering the needs of the client.
Generally for equipment hire minimum 72 hours “advance booking” is applicable including arrival on site.
While on site, oprator safety,accommodation and pure drinking water must be provided by lessee.
In case of quipment hire one month or 240 hours, whichever comes frist, must be paid to “Monon International” in advance.
Monon international undertakes to replace any equipment in case of mechanical problems while working on site, in the shortest possible time, if the equipment is not operational for any reason, the equipment will be replaced.
Δ